Logo of Huzzle

[Summer 2025] Water Systems Construction Intern

image

TSMC

12d ago

  • Internship
    Full-time
    Summer Internship
  • Construction & Surveying
    Engineering
  • Phoenix

AI generated summary

  • You must be eligible to work in the U.S., enrolled in a relevant degree program, available full-time on-site, proficient in Microsoft Office, and able to navigate an active construction site.
  • You will collaborate with construction teams on water systems, monitor activities, assist with project management tasks, and help troubleshoot field issues and commissioning problems.

Requirements

  • Must be legally eligible to work in the United States and have:
  • Must be currently enrolled at an accredited university, in [one of] the following degree programs: Bachelors/Masters of Chemical Engineering or Environmental Engineering.
  • Must be able to work full-time (40 hours per week) on-site at our Phoenix location, from:
  • Semester system: May 19th, 2025 – August 1st, 2025
  • Quarter system: June 16th, 2025 - August 29th, 2025
  • Proficient with Microsoft Office suite (PPT, Excel, Word, Outlook)
  • Must be able to walk around active and changing construction site for extended periods of time to monitor construction and commissioning activities in multiple places.

Responsibilities

  • Working side-by-side with the TSMC construction teams, mechanical & water engineering teams, and construction crews to work on TSMC water systems including cutting edge ultra-pure water systems and specialty wastewater treatment systems (exotic waste streams).
  • Monitor and track key construction activities in the field with TSMC construction managers all electrical installation and troubleshooting work.
  • Work on forecasting, reporting, and work planning activities with TSMC project management.
  • Assist to troubleshoot commissioning problems, construction hold-ups, field issues, and help respond to RFIs from the construction crews in the field.

FAQs

What is the duration of the internship?

The internship lasts for the summer of 2025, with specific dates for the semester system being from May 19th, 2025, to August 1st, 2025, and for the quarter system from June 16th, 2025, to August 29th, 2025.

What are the required qualifications for this internship?

Applicants must be currently enrolled at an accredited university in either Chemical Engineering or Environmental Engineering programs, and must be legally eligible to work in the United States.

Is this internship paid?

The job description does not specify, but most internships at TSMC Arizona are typically paid positions.

Will I need to work on a construction site?

Yes, you will need to be on an active and changing construction site for extended periods to monitor construction and commissioning activities.

What software skills are required for this internship?

Applicants must be proficient with the Microsoft Office suite, including PowerPoint, Excel, Word, and Outlook.

Are there opportunities for future employment after the internship?

While the internship itself does not guarantee future employment, it may provide valuable experience and networking opportunities that could lead to job offers upon graduation.

Is travel required for this position?

No, there is no travel required for this internship.

Will I work independently or as part of a team?

You will work side-by-side with TSMC construction teams, mechanical and water engineering teams, and construction crews, indicating that teamwork is a crucial aspect of this role.

What core values does TSMC Arizona emphasize for interns?

TSMC Arizona emphasizes core values of Integrity, Commitment, Innovation, and Customer Trust.

When can I apply for this internship?

The specific application timeline is not mentioned in the job description, but you should apply as soon as possible since internships are typically competitive.

The trusted technology and capacity provider of the global logic IC industry

Manufacturing & Electronics
Industry
10,001+
Employees
1987
Founded Year

Mission & Purpose

Established in 1987, TSMC is the world's first dedicated semiconductor foundry. As the founder and a leader of the Dedicated IC Foundry segment, TSMC has built its reputation by offering advanced and "More-than-Moore"​ wafer production processes and unparalleled manufacturing efficiency. From its inception, TSMC has consistently offered the foundry segment's leading technologies and TSMC COMPATIBLE® design services. TSMC has consistently experienced strong growth by building solid partnerships with its customers, large and small. IC suppliers from around the world trust TSMC with their manufacturing needs, thanks to its unique integration of cutting-edge process technologies, pioneering design services, manufacturing productivity and product quality. The company's total managed capacity reached above 9 million 12-inch equivalent wafers in 2015. TSMC operates three advanced 12-inch wafer fabs, four eight-inch wafer fabs, one six-inch wafer fab (fab 2) and two backend fabs (advanced backend fab 1 and 2). TSMC also manages two eight-inch fabs at wholly owned subsidiaries: WaferTech in the United States and TSMC China Company Limited. TSMC also obtains eight-inch wafer capacity from other companies in which the Company has an equity interest.