What is the primary purpose of the Support CPP Operation role?
The primary purpose of the Support CPP Operation role is to ensure optimal utilization of workmen and equipment, conduct safety talks, inspect processes and equipment, respond to emergencies, manage work orders, and control operational losses.
Are there specific safety protocols that need to be followed?
Yes, conducting toolbox talks and ensuring safety practices are paramount, including mechanical and electrical isolation of equipment before maintenance work begins.
How are work assignments communicated to maintenance teams?
Work assignments are communicated through the preparation and approval of Work Orders (WO), which are then shared with the concerned maintenance team for corrective actions.
What actions should be taken in case of an emergency?
In case of an emergency, the individual should respond appropriately, escalate major breakdowns to management, and manage the situation to the best of their ability.
What is LOTOTO and why is it important?
LOTOTO stands for Lock Out Tag Out Tag Out, and it is important as it ensures that equipment is properly isolated before maintenance work begins, safeguarding the personnel involved.
How is equipment performance assessed post-maintenance?
Equipment performance is assessed through feedback provided after the completion of work permits and work orders, informing about the running condition of the equipment.
What responsibilities do you have during planned shutdowns or commissioning?
During planned shutdowns or commissioning, responsibilities include executing jobs as per schedule and SOP, ensuring operational readiness, and maintaining effective communication.
How is shift reporting conducted?
Shift reporting is conducted through eReporting and production MIS at the end of the shift, along with entries in the logbook to reflect the shift's activities.
What types of operational losses are you tasked to control?
I am tasked with controlling all types of operational losses, including the efficient utilization of natural resources such as raw materials, electricity, air, fuel, oil, and water.
Is there a specific process for handling major abnormalities detected during inspections?
Yes, major abnormalities found during inspections must be reported immediately and documented in a defect register for resolution.